BELROSE, NSW Service: Switchboard Upgrade Problem:After having 15KW of solar panels installed this customer in Belrose needed to upgrade his service mains to allow effective back feeding of the solar energy to the grid. Solution:25MM service mains were installed and...
TURRAMURRA, NSW Service: Galvanised Pole And New Switchboard Problem:After a 2 year build this home in Turramurra was ready to be connected to the grid with a permanent 3 phase 100 Amp supply. Solution:A 7.2m Galvanised pole was required to gain appropriate clearance...
PALM BEACH, NSW Service: Switchboard Upgrade Problem:This large house in Palm Beach had been divided into 3 flats and after many years of wiring alterations at the switchboard the owner decided it was time to upgrade it completely. Solution:A generator was provided...
NEWPORT, NSW Service: Underground Overhead Mains Supply Problem:Our clients wanted to place their incoming electrical and data cables underground. Solution:Excavation of a trench from the network pole to the newly installed electrical pillar located in the front...
TURRAMURRA, NSW Service: Underground Overhead Mains Supply Problem:Our clients wanted to place their incoming electrical data cables underground. Solution:During the new home construction and underground electrical supply was trenched to the new underground pillar...