Dee Why, NSW
Service: 200 AMP Mains Upgrade and Private Pole Installation – Unit Block, Dee Why
Problem:
During remedial building works the consumer mains were damaged and needed repair. This coupled with increasing tripping of circuits due to increased consumer load called for an entire upgrade to their electrical supply.
Solution:
An application to the supply authority was carried out and an approval to increase the electrical supply was granted.
This meant the cabling to the property, cable route, installation of Galvanised Steel Private Pole and all protection devices had to be upgraded to comply with current regulations.