WESTERN SYDNEY
Service: Hardwood Timmber Poles Installation
This landfill site required 8 hardwood timber poles throughout its 50 Acre expanse to maintain level backfilling indicators over time. The poles were delivered a week prior to the installation date and painted by the owners of the site with meter measurements in high visibility colors.We took two trucks to site, one to drill the holes in proposed locations and 1 truck following behind installing and leveling the poles. In 5 short hours the poles were installed and left in place to be slowly buried over the coming years.