INGLESIDE, NSW Service: Hardwood Timber Pole Installation And New Switchboard Problem:This large vegetation management site in Ingleside required a separate power connection to provide electricity for a timber milling workshop. Solution: We applied for permission to...
CAMDEN, NSW Service: Timber Pole Replacement Problem:This timber pole was on the verge of falling over when we arrived to replace it. Solution:The aerial service line was temporarily removed and the pole extracted using our crane truck, the new footing had to be moved...
WINDSOR, NSW Service: Private Pole Replacement Problem:A 10M hardwood timber private pole required relocation and replacement in the carpark of a construction site in Windsor, The proposed location was setup as an exclusion zone with witches hats and a safety...
PALM BEACH, NSW Service: Titan Composite Private Pole Replacement Problem:Customer in Palm Beach received a defect notice from the supply authority for a rotten timber private pole on their sloping block. Clients opted for the longer lasting Titan Composite pole being...
TURRAMURRA, NSW Service: Galvanised Pole And New Switchboard Problem:After a 2 year build this home in Turramurra was ready to be connected to the grid with a permanent 3 phase 100 Amp supply. Solution:A 7.2m Galvanised pole was required to gain appropriate clearance...